Site Plan (Scheme Plans)
Earthworks Design
Roading Design
Site Service Design
Erosion & Sediment Control Plan
Wastewater design (gravity, Septic tank, pressure system)
water design
Stormwater design
Carparks Design
Vehicle Crossing
Fire Fighting Assessment
Flood modelling (HEC-RAS, HEC-HMS, SWMM, etc)
Flood assessment Report
Expert Witness (Environment Court)
Bioretention Design
Porous Concrete Design
Rain Tank Design
Stormwater Management Plan
Soakage system design for stormwater (On-site disposal)
Retention and Detention design
Wetland Design
Overland flow Path Reports
Network Discharge Consents (NDC)
Culverts design
Stopbank design
Construction Monitoring
Feasibility Report
Resource Consent
Assessment of Environmental Effects
Engineering Approval
Building Consent
Infrastructure Report
Producer Statement (PS1, PS2 and PS4)
COA - Certificate of acceptance
Quantity and Cost estimates
NZS 3910 Contract Management
Contractor Observation / Supervision
Neighbor's Approval
Council Requests for further information (S92)
Consent condition review, compliance, and change (S127 or in accordance)